Remodeling
Home Remodeling & Whole-Home Renovation - Upstate SC
From kitchen and bathroom renovations to whole-house remodels, I handle all phases: design, demolition, structural work, electrical, plumbing, and complete finishing. Every project managed personally from start to finish.
Cost Range
$5,500–$350,000+ Typical
Timeline
2-8 Weeks Typical
Experience
Since 1995
Rating
BBB A+ Rated
Home Remodeling at a Glance
Burch Contracting remodels homes in Simpsonville, Greenville, Fountain Inn, Mauldin and Laurens County, from a single kitchen or bathroom to a whole-house renovation. We work design-build: one licensed general contractor (SC #CLG118679) handles the layout, selections, permits, demolition, structural changes, plumbing, electrical and finishes. A bathroom typically takes 2 to 4 weeks, a kitchen 4 to 8, and a whole-house remodel 12 to 20.
- Typical cost
- $5,500–$350,000+ Typical
- Typical timeline
- 2-8 Weeks
- Permit required
- Yes for anything that moves plumbing, adds electrical, changes structure or opens walls; we pull it
- How we work
- Design-build: design, selections and construction under one contract
- Who runs it
- C. Scott Burch, SC Licensed General Contractor #CLG118679, remodeling Upstate homes since 1995
- Price your own
- Try the whole-home, kitchen or bath calculator
How much does a kitchen or bathroom remodel cost?
Remodeling cost depends entirely on scope, from a modest bathroom refresh up through a full luxury master bath, and from a budget kitchen refresh up through a high-end custom kitchen. Use our kitchen remodel and bath remodel calculators for an estimate matched to your project size and finish level.
How long does a remodel take?
Timelines vary by project: a bathroom remodel typically takes 2 to 4 weeks, a kitchen remodel 4 to 8 weeks, and a whole-house remodel 12 to 20 weeks. Structural changes, custom cabinetry, and long-lead materials can extend these ranges.
Do you handle whole-house remodels?
Yes. We handle comprehensive whole-house renovations involving multiple rooms, structural changes, and systems upgrades, as well as individual kitchen and bathroom remodels. Every project is managed personally by Scott Burch from demolition through final finishing.
Do you provide design, or do I need to hire a designer first?
We work design-build, handling design, demolition, structural work, electrical, plumbing, and finishing under one roof. You do not need to line up a separate designer and contractor — we manage all phases so decisions stay coordinated and on budget.
Common Home Remodeling Projects
Real-world project examples with typical costs in Upstate SC:
| Project Type | Size | Typical Cost | Details |
|---|---|---|---|
| Modest Bathroom Remodel | 5×8 full bath | $6,375–$7,677 | New tub/shower, vanity, toilet, flooring, tile work, updated electrical and plumbing |
| Mid-Range Kitchen Remodel | 10×12 kitchen | $22,539–$27,143 | New cabinets, countertops, appliances, flooring, lighting, backsplash, reconfigured layout |
| Luxury Master Bath | 8×12 or larger | $60,103–$72,382 | Custom tile shower, soaking tub, double vanity, heated floors, premium fixtures |
What We Handle
Design & Planning
- Design-build: design, selections and construction under one roof
- No separate designer to hire and coordinate
- Permits pulled as part of the job
Structure & Systems
- Demolition and structural changes
- Electrical and plumbing upgrades
- Systems upgrades across multiple rooms
Kitchens, Baths & Whole-House
- Kitchens: cabinets, countertops, appliances, flooring, lighting, backsplash, reconfigured layouts
- Bathrooms: tub or shower, vanity, toilet, flooring, tile, updated plumbing and electrical
- Whole-house: multiple rooms and a complete interior refresh
Home Remodeling Pricing Breakdown
Three pricing tiers to match your project scope and budget:
| Tier | Price Range | What's Included |
|---|---|---|
| Bathroom Remodeling | $5,578–$75,398 | Full bathroom renovation including new fixtures, tile, vanity, flooring, and updated plumbing/electrical. Modest remodel $6-8K, luxury master bath $60-72K. |
| Kitchen Remodeling | $25,043–$64,431 | Complete kitchen renovation with new cabinets, countertops, appliances, flooring, lighting. Budget refresh $25-30K, mid-range remodel $38-45K, high-end custom $54-64K+. |
| Whole-House Remodel | $60,000–$350,000+ | Comprehensive home renovation including multiple rooms, structural changes, systems upgrades, complete interior refresh. Custom scope and pricing. |
Home Remodeling Cost Guides & Planning Articles
Cost guide
Kitchen Remodel Cost in Simpsonville, SC
Kitchen remodel costs in Simpsonville SC by scope, computed from our own pricing — refresh, full remodel and layout changes, with what drives each.
Cost guide
Kitchen Remodel Cost in Greenville, SC
Kitchen remodel costs in Greenville SC, computed from our own pricing, including what older homes near downtown add to the scope.
Cost guide
Bathroom Remodel Cost in Simpsonville, SC
Bathroom remodel costs in Simpsonville SC from powder room to primary suite, computed from our own pricing, with tile and plumbing factors explained.
Cost guide
Bathroom Remodel Cost in Greenville, SC
Bathroom remodel costs in Greenville SC by scope, computed from our own pricing, including what older homes add and where budgets usually go.
Article
Do You Need Permits for Remodeling in Simpsonville, SC?
Which remodeling projects need a permit in Simpsonville SC, which do not, and what unpermitted work costs you at resale.
Article
Best Home Improvements for Property Value in South Carolina
Which home improvements hold their value best in South Carolina, which rarely pay back, and why usable outdoor space does well in this market.
One Room, Several Rooms or the Whole House?
Most remodels start with one room and grow. A kitchen update turns into new flooring through the main level; a primary bath becomes a reason to rework the closet next to it. That is fine, but scope decisions are cheapest at the beginning. Deciding up front which rooms are in, and in what order, lets the plumbing, electrical and flooring be done once instead of patched in two or three passes.
| Scope | Typical work | Typical timeline |
|---|---|---|
| Single bathroom | Fixtures, tile, vanity, waterproofing, updated plumbing and electrical — see Bathroom Remodeling | 2 to 4 weeks |
| Kitchen | Cabinets, counters, appliances, lighting, flooring, sometimes a new layout — see Kitchen Remodeling | 4 to 8 weeks |
| Multi-room | Kitchen plus adjoining living areas, or several baths; shared flooring and paint | Depends on the rooms; planned as one schedule |
| Whole house | Layout changes, systems upgrades, every room refreshed, often exterior work too | 12 to 20 weeks |
Remodeling the Upstate's Housing Stock
The houses we remodel fall into two broad groups, and they need different things. The older homes around downtown Simpsonville, Fountain Inn, Woodruff and Laurens, many built between the 1920s and the 1960s, have character worth keeping and systems that are usually due: ungrounded two-prong wiring, galvanized or cast-iron plumbing, little insulation and rooms laid out for a different way of living.
The subdivisions built across Simpsonville, Five Forks, Mauldin and Fountain Inn from the 1990s on have the opposite problem. The structure and systems are generally sound, but the kitchens and baths were finished to a builder-grade standard that is now twenty or thirty years old: laminate counters, fiberglass tub-showers, hollow-core doors and a closed-off kitchen. Those remodels are mostly about layout and finishes.
- Polybutylene supply pipe (gray plastic, installed roughly 1978 to 1995) turns up in some Upstate homes and is worth replacing while walls are open.
- Lead paint: in a house built before 1978, painted surfaces that will be disturbed should be tested; federal EPA rules require lead-safe work practices by certified renovators when lead is present.
- Asbestos can be in older floor tile, mastic, popcorn ceilings and pipe insulation. Suspect material is tested before demolition, not after.
- Electrical panels in older homes often lack the capacity for a modern kitchen, a heat pump and an EV charger at once; a panel upgrade belongs in the plan, not the change order.
Opening Up a Floor Plan: Load-Bearing Walls
The most common whole-house request we get is taking out the wall between the kitchen and the living room. Sometimes that wall carries nothing but drywall. Often it carries the ceiling joists or the roof, and removing it means installing a beam sized for the load, with posts that carry that load all the way down to the foundation.
We check which way the framing runs and what sits above the wall before anyone quotes it, and when a beam is needed it is sized by the span tables or by an engineer, depending on the load, and inspected under the permit. Plumbing vents, ductwork and wiring in the wall also have to go somewhere, and they are part of the price from the start.
The Order a Whole-House Remodel Happens In
A whole-house remodel is a sequence of trades, and the schedule depends on getting each one in at the right time. This is the usual order:
| Phase | What happens |
|---|---|
| 1. Design and selections | Layout, finishes, cabinets, fixtures and appliances chosen; long-lead items ordered |
| 2. Permits | Drawings submitted to the city or county; work starts once the permit is issued |
| 3. Demolition and testing | Rooms opened up; suspect materials tested; hidden problems found and priced |
| 4. Structure | Walls removed or moved, beams installed, framing repaired |
| 5. Rough-ins | Plumbing, electrical and HVAC run in the open walls, then inspected |
| 6. Insulation and drywall | Insulation inspected, walls closed, finished and primed |
| 7. Finishes | Cabinets, counters, tile, flooring, trim, doors and paint |
| 8. Fixtures and final | Plumbing and light fixtures, appliances, punch list and final inspection |
Design-Build vs. Hiring a Designer and a Builder Separately
There are two common ways to run a remodel. In the traditional approach you hire a designer or architect, get drawings, and then put those drawings out to bid with builders. In design-build, one company handles the design and the construction under one contract. We work design-build, and for most residential remodels it is the simpler route; for some very large or architecturally ambitious projects, a separate architect makes sense, and we are happy to build from their plans.
| Factor | Design-build | Separate designer, then builder |
|---|---|---|
| Contracts | One | Two or more |
| Pricing | Design is priced against real construction costs as it develops | Design can outrun the budget before bids come back |
| Accountability | One party responsible for design and construction | Gaps between drawings and field conditions fall between parties |
| Schedule | Ordering and permitting can start while details are finalized | Bidding adds weeks after design is complete |
| Best fit | Most kitchens, baths, multi-room and whole-house remodels | Large custom projects where an architect leads the design |
Living at Home During a Remodel
Most of our clients stay in the house, and with planning it works. We phase the job so there is always a working bathroom, set up a temporary kitchen when the real one is out, seal off the work area with dust barriers and keep water and power shutoffs as short as the work allows. For a full gut of the main living level, some families arrange to be away for the loudest weeks of demolition and rough-in; we tell you up front which weeks those will be.
Getting the Most From a Remodeling Budget
The pricing table above shows typical ranges for a bath, a kitchen and a whole house. Within any budget, the money that holds value in this market goes to the kitchen and primary bath, to systems that a buyer's inspector will check, and to layout changes that make the house work better. Highly personal finishes are worth doing if you will enjoy them, but they are spending, not investing. Our article on the best home improvements for property value in South Carolina goes into which projects return the most.
If budget is the constraint, phasing is a legitimate plan: do the systems and structural work now, while walls are open, and finishes later. What does not phase well is doing finishes first and opening the same walls again a year later.
Choosing a Remodeling Contractor
- Check the license. Look up any contractor on the SC Department of Labor, Licensing and Regulation site. Ours is #CLG118679.
- Ask who pulls the permits. The contractor should, for every trade.
- Get an itemized, written scope. Allowances for cabinets, tile and fixtures should be spelled out so you can compare quotes fairly.
- Ask how hidden conditions are handled. Rot, old wiring and plumbing problems behind walls are normal in a remodel; the contract should say how they are priced.
- Ask who is on site. On our jobs, Scott Burch oversees the work himself.
More Home Remodeling Questions
Direct answers for homeowners and AI search — licensed, local, and accountable.
Will my kitchen or bathroom be usable during the remodel?
For most kitchen and bathroom remodels there is a period where the space is out of use while fixtures, plumbing, and finishes are replaced. We sequence the work to keep that window as short as practical and walk you through what to expect before demolition starts.
Do I need a permit for a remodel?
If the work changes structure, plumbing, electrical or mechanical systems, yes — which covers most full kitchen, bathroom and whole-house remodels. Paint, flooring, countertops, and replacing a fixture in the same location generally do not. For Greenville County addresses the review runs through Greenville County Building Safety, and HOA approval is a separate matter. We pull the permit on projects we build.
Can I remove a wall to open my kitchen to the living room?
Usually, yes. If the wall is load-bearing it needs a properly sized beam and posts carried to the foundation, plus a plan for any plumbing, ducts or wiring inside it. We check the framing on the first visit, and the work is permitted and inspected.
Should I remodel everything at once or in phases?
Doing it at once is usually less expensive overall and gets the disruption over with. Phasing works well when budget is the limit, as long as structural, plumbing and electrical work is done first. Finishes are the part that phases best.
Is it worth remodeling an older home in downtown Simpsonville or Laurens?
Often it is: older Upstate homes tend to have solid framing and character that is hard to build new. Budget for the systems as well as the finishes, since wiring, plumbing and insulation in a home from that era are usually due. We look at those first so the quote reflects the real house.
What should I do to get ready for a remodel?
Collect photos of rooms you like, decide which rooms are in scope and what matters most, and think about where you will cook and shower during the work. If you are in an HOA, check whether exterior changes need approval. We take it from there in the design and selections stage.
Home Remodeling Service Areas
Based in Gray Court (Laurens County), we take home remodeling projects across Greenville and Laurens Counties and nearby Spartanburg County. Local permit offices, lot conditions and featured projects for each community:
Ready to Start Your Home Remodeling Project?
Free consultation and ballpark estimate. A+ BBB Rating, 5.0 Google Rating, 30+ years serving Upstate SC.