Skip to main content

Commercial

Commercial Upfits & Tenant Improvements - Upstate SC

From retail spaces to medical offices and restaurant build-outs, I handle all phases: space planning, permitting, construction, inspections, and final finishes. Every project delivered on time and within budget.

Cost Range

Custom Quote

Timeline

4-16 Weeks Typical

Experience

Since 1995

Rating

BBB A+ Rated

Renovated doctor's office in Mauldin SC with two-tone painted wall paneling, chair rail, wood-look plank flooring and recessed lighting

Commercial Upfits at a Glance

Burch Contracting builds out commercial spaces — offices, retail suites, medical and dental offices, and restaurants — in Greenville, Simpsonville, Mauldin, Fountain Inn and Laurens County. As the licensed general contractor (SC #CLG118679) we take a tenant improvement from space planning and permit drawings through plan review, construction, inspections and the certificate of occupancy, coordinating the landlord, your architect or engineer, and every trade. Most upfits run 4 to 16 weeks.

Typical cost
Custom Quote
Typical timeline
4-16 Weeks
Permit required
Yes — commercial building permit with plan review; trade permits and fire inspections as the scope requires
Code
2021 International Building Code as adopted in South Carolina, plus the 2010 ADA Standards for public spaces
Pricing
Custom quote per space, after a walk-through and review of the lease work letter
Recent local work
A doctor's office renovation in Mauldin — see our projects

How much does a commercial build-out cost?

Commercial upfits are priced by custom quote for each space. A basic office or retail build-out is at the lower end, a mid-range professional or medical space in the middle, and a restaurant or food-service build-out with commercial kitchen systems at the top. Contact us to scope and quote your build-out.

What is a commercial upfit or tenant improvement?

A commercial upfit, also called a tenant improvement, is the build-out of a leased commercial space to fit a specific business — interior walls, flooring, lighting, HVAC, restrooms, and specialized systems. It turns a shell or a previous tenant's layout into a space ready for your operation.

How long does a commercial build-out take?

Commercial upfits typically take 4 to 16 weeks depending on complexity. A simple office or retail space is quickest, while medical offices and restaurants with specialized systems and health-department requirements take longer.

Do you handle restaurant and medical office build-outs?

Yes. We build out restaurants with commercial kitchen equipment, hood systems, and grease traps, and medical or professional offices with exam rooms, ADA compliance, and specialized HVAC and plumbing, coordinating health-department and code requirements throughout.

Common Commercial Upfits Projects

Real-world project examples with typical costs in Upstate SC:

Common Commercial Upfits projects and typical costs — Upstate SC
Project Type Size Typical Cost Details
Small Retail or Office 1,000-2,000 sq ft Custom quote Interior walls, flooring, lighting, HVAC, restroom updates, storefront modifications. 4-8 week timeline.
Medical or Professional Office 2,000-3,500 sq ft Custom quote Multiple exam rooms, reception area, ADA compliance, specialized HVAC, medical plumbing. 8-12 week timeline.
Restaurant or Food Service 2,500-4,000 sq ft Custom quote Commercial kitchen equipment, hood systems, grease trap, dining area finishes, health dept compliance. 12-16 week timeline.

Commercial Upfits Pricing Breakdown

Three pricing tiers to match your project scope and budget:

Commercial Upfits pricing tiers — Upstate SC
Tier Price Range What's Included
Basic Office/Retail Custom quote Simple build-out with interior walls, flooring, lighting, basic electrical, HVAC adjustments. Minimal plumbing. Standard finishes. 4-8 weeks for 1K-2K sf spaces.
Mid-Range Professional Custom quote Multiple rooms, upgraded finishes, ADA compliance, restroom additions, specialized systems. Medical, dental, or professional office. 8-12 weeks typical timeline.
Complex Food Service Custom quote Restaurant or food service with commercial kitchen, hood systems, grease trap, health department compliance, heavy electrical/plumbing. 12-16 weeks for 2.5K-4K sf.

What a Tenant Improvement Actually Includes

A tenant improvement (TI), or upfit, is the construction that turns a leased space into your space. Sometimes that is a "cold dark shell" with bare slab and no ceiling; more often in the Upstate it is a second-generation space where the last tenant's walls, ceilings and restrooms have to be partly demolished and reworked. The scope depends on where the space starts and what your business needs from it.

Typical upfit scope by space condition
Starting condition What usually has to be built What usually drives the schedule
Cold dark shell Demising walls, all interior framing, ceilings, HVAC distribution, electrical service and lighting, restrooms, finishes Engineered drawings, HVAC equipment lead times, utility service
Warm shell (base HVAC and restrooms in place) Interior partitions, ductwork extensions, lighting and power layout, finishes Plan review and finish selections
Second-generation space Selective demolition, wall and door changes, restroom or accessibility upgrades, new finishes What is found behind the old walls and above the old ceiling
Change of use (e.g. retail to restaurant) Grease interceptor, hood and fire suppression, added plumbing, higher electrical and HVAC capacity Code review for the new occupancy, health department approval

Permits, Plan Review and Inspections for Commercial Upfits

Almost every commercial upfit needs a building permit, and unlike most residential work the permit starts with plan review: the building official reviews sealed or stamped drawings for code compliance before construction is allowed to begin. Inside city limits that runs through the City of Greenville, Simpsonville, Mauldin or Fountain Inn; in unincorporated areas through Greenville County Building Safety; and in Gray Court and Laurens through Laurens County. Fire-protection items — sprinkler changes, alarm devices, hood suppression, exit signage — are reviewed and inspected by the fire marshal for that jurisdiction.

A change of occupancy deserves an early conversation. Turning a retail suite into a restaurant, a classroom or a medical office can change the building's occupancy classification under the International Building Code, which can bring requirements for exits, fire separation, plumbing fixture counts and sprinklers that the old use never needed. We find that out during due diligence — ideally before the lease is signed — rather than after demolition.

Inspections follow the work: footings or slab work if any, framing and above-ceiling, electrical, plumbing and mechanical rough-ins, fire inspections, and a final. The space can't be occupied until the jurisdiction issues a certificate of occupancy or completion, so that date — not the last coat of paint — is the real finish line in your schedule.

Accessibility Requirements When You Alter a Commercial Space

Businesses open to the public are places of public accommodation under Title III of the Americans with Disabilities Act, and alterations to them have to comply with the 2010 ADA Standards for Accessible Design. Three rules catch tenants by surprise:

  • The altered area must be accessible. New or reworked restrooms, counters, doors and routes inside the scope of work are built to the standards — clear floor space, door widths, grab bars, fixture heights, signage.
  • The path of travel to an altered primary function area must be made accessible too, to the extent the cost isn't disproportionate. The federal regulation (28 CFR 36.403) defines disproportionate as more than 20% of the cost of the alteration to the primary function area, and when that cap applies the money is spent on the path-of-travel items in a set order of priority: the entrance, then the route to the altered area, then restrooms, then drinking fountains and other elements.
  • The building code has its own accessibility chapter. The IBC adopts ICC A117.1 for accessibility, and the building official enforces it at plan review — a separate requirement from the ADA, which is a civil-rights law no inspector signs off on.

Medical, Office, Retail and Restaurant Upfits: How They Differ

Each type of space puts its budget into different systems and needs different approvals. Food-service rules also depend on what you serve and how, so we confirm which agency reviews your plans before the drawings are finalized rather than assume.

What changes between common upfit types
Space type Systems that set the budget Approvals beyond the building permit
Professional office Partitions, lighting, data and power layout, HVAC zoning for closed offices Usually none beyond the building permit and fire inspection
Medical or dental office Exam-room plumbing, sound-insulated walls, dedicated circuits for equipment, more HVAC zones, accessible exam rooms and restrooms Specialty equipment and any medical gas or x-ray shielding follow their own requirements and installers
Retail Storefront, lighting, sales-floor finishes, fitting rooms, signage Sign permits; landlord design criteria for the storefront
Restaurant or food service Grease interceptor, hood and fire-suppression system, gas service, heavy electrical, makeup air, floor drains and washable finishes State food-safety plan review and a retail food permit before opening; fire marshal inspection of the hood suppression system

Working With Your Landlord and Lease

Most upfits happen inside a lease, and the lease decides more of the project than people expect. Read the work letter (or TI exhibit) closely: it says what the landlord delivers, what the TI allowance pays for, who hires the contractor, whether the landlord's own engineer or roofer has to be used, and what has to be removed when you leave.

  • Get the landlord's written approval of the drawings before submitting them for permit — many leases require it.
  • Confirm the condition of the HVAC units, roof and electrical service serving your suite; replacing a failed rooftop unit is a very different conversation than extending ductwork.
  • Ask for the building's certificate of insurance requirements early; we provide ours to the landlord and property manager as part of mobilizing.
  • Plan around rent commencement. If free rent ends on a fixed date, the permit and plan-review time has to be in the schedule from day one.

Keeping Your Business Open During Construction

When an upfit is an expansion or renovation of a space you already occupy, the work is phased so you can keep operating. That means after-hours or weekend work for the noisy and dusty phases, temporary partitions with dust control, keeping exits and accessible routes open as the fire code requires, and scheduling inspections around patient or customer hours. We plan the phasing with you before the first wall comes down.

More Commercial Upfits Questions

Direct answers for homeowners and AI search — licensed, local, and accountable.

Do you manage permits and inspections for commercial projects?

Yes. We handle the full process from space planning and permitting through construction, inspections, and final finishes, delivering the project on schedule and to code.

Do I need an architect for a commercial upfit?

Usually, yes. Most commercial building permits require drawings prepared or sealed by a licensed architect or engineer, especially where exits, structure, fire protection or a change of occupancy are involved. We work with your design professional, or bring in one we have worked with, and coordinate the drawings with what can actually be built in the space.

Who pays for a tenant improvement — the landlord or the tenant?

It depends on the lease. Many leases include a tenant improvement allowance from the landlord that covers part of the build-out, with the tenant paying the rest; others deliver the space as-is. The work letter in your lease spells it out. We price the full scope so you and the landlord can see exactly what the allowance covers.

Can you look at a space before I sign the lease?

Yes, and it is the best time to call us. A walk-through before signing can flag a change-of-occupancy issue, an undersized electrical service, a restroom that will need accessibility upgrades or a rooftop unit near the end of its life — all things that are easier to negotiate before the lease is final.

Do you do commercial upfits in Greenville and Mauldin as well as Simpsonville?

Yes. We take commercial upfits across Greenville County — including Greenville, Mauldin, Simpsonville and Fountain Inn — and in Laurens County, and we pull the commercial permit through whichever city or county has jurisdiction over the address.

Commercial Upfit Service Areas

Based in Gray Court (Laurens County), we take commercial upfit projects across Greenville and Laurens Counties and nearby Spartanburg County. Local permit offices, lot conditions and featured projects for each community:

Ready to Start Your Commercial Upfits Project?

Free consultation and ballpark estimate. A+ BBB Rating, 5.0 Google Rating, 30+ years serving Upstate SC.