Kitchen Remodeling · Fountain Inn, SC
Kitchen Remodel Cost in Fountain Inn, SC
Kitchen remodels in Fountain Inn run $125–$322 per square foot. A 180 sq ft kitchen refresh starts near $22,539–$27,143; a full remodel with new cabinetry runs about $33,808–$40,715, and a custom kitchen with layout changes reaches $48,151–$57,988.
Kitchen Remodeling Cost by Scope
Computed from the same pricing engine as our calculators — run your own numbers to change size, materials or site conditions.
| Scope | Typical Cost | Size | What's Included |
|---|---|---|---|
| Refresh, 180 sq ft | $22,539–$27,143 | 180 sq ft | Counters, backsplash, sink, fixtures, paint and hardware — cabinets and layout stay. |
| Full remodel, 180 sq ft | $33,808–$40,715 | 180 sq ft | New cabinets, counters, flooring, lighting and appliances in the existing footprint. |
| Custom, 180 sq ft | $48,151–$57,988 | 180 sq ft | Layout redesign, custom millwork, premium appliances and the utilities a new plan needs. |
What Moves the Price
- Whether the layout moves — the single biggest fork in a kitchen budget.
- Cabinet grade: refacing, stock, semi-custom or custom.
- Countertop material, seams and cutouts.
- Appliance package, including venting to the outside.
- Electrical capacity and added circuits for modern appliances.
- Subfloor condition, discovered when the old flooring comes up.
Where the budget goes
Cabinetry and counters usually take the largest share, then labor, then appliances, then flooring and lighting. The items homeowners underestimate are the invisible ones: electrical upgrades, venting, subfloor repair, and the trim work that makes a new kitchen look built rather than assembled.
Kitchen Remodeling Questions
How much does a kitchen remodel cost in Fountain Inn SC?
From about $22,539–$27,143 for a refresh of a 180 sq ft kitchen to roughly $48,151–$57,988 for a custom remodel with layout changes.
What is the cheapest way to update a kitchen?
Keep the layout and the cabinet boxes. New counters, a backsplash, hardware, paint and lighting transform how a kitchen looks without touching plumbing, gas or structure — which is where costs escalate.
How long does a kitchen remodel take?
Four to eight weeks of construction for a full remodel, two to three for a refresh, plus selection and ordering time beforehand. Custom cabinetry has the longest lead.
Do you handle permits for kitchen work?
Yes. Where the work alters plumbing, electrical or structure it needs a permit, and we pull it and schedule the inspections as part of the project.
Permits & codes: Greenville County Building Safety · SC Building Codes Council
More on this service: Kitchen Remodeling · cost calculator
Planning a Kitchen Remodeling Project?
Free consultation and a real ballpark estimate. A+ BBB Rating, 5.0 Google Rating, licensed in SC since 1995.